Metro Slitting Optimization & Labour Job Card System

Net Finished Weight 0.00 KG Req: 0.00 KG
Total Trim Wastage 0.00 KG 0.0% scrap
Avg Waste / Roll 0.00 KG 0 total rolls
Gross Raw Material 0.00 KG 0 machine runs
Slitting Efficiency 0.0% Net Material Yield
Available Machine Shafts

Select one or multiple shafts for multi-scenario optimization comparison:

Customer Orders Input
Party Qual Width GSM Length Target Wt
# Shaft Quality GSM Lane Combination (Cutting Setup) Length (m) Total Rolls Net Wt (KG) Waste (in / KG) Waste/Roll Gross Wt
TOTALS 0.0 m 0 0.00 KG 0.00 KG 0.00 KG 0.00 KG
Machine Operator Signature
Name: __________________________
QC Scale Weight Verified
[   ] Weight Confirmed OK
Supervisor Approval
Sign: __________________________
Run # Shaft Quality GSM Used Width Waste Width Length (m) Rolls Net Wt Waste KG Waste/Roll Gross Wt Efficiency
Party / Client Name Quality Width (inch) GSM Roll Quantity Total Length (m) Net Weight Produced (KG)
Rank Plan / Shaft Scenario Total Waste Waste % Avg Waste/Roll Net Wt Gross Wt Efficiency Runs Rolls Status